IIT Kharagpur is consuming almost 9 MLD of water out of which 2.3 MLD is being treated in 5 sewage treatment plants (STPs) and 2 effluent treatment plants (ETPs) in IIT Kharagpur campus. A summary of the salient features is provided below.

Out of 2.3 MLD of treated wastewater, 40% is reused for horticulture and floor cleaning purposes in some of the biggest halls of our campus.

Salient features of sewage and effluent treatment plants in IIT Kharagpur campus

S. No. Description Year of commissioning Capacity, Million litres per day (MLD)
1 STP-1 2021 1.35
2 STP at Pump house 3 2015 0.3
3 STP at SPMS Hospital 2021 0.5
4 STP for Diamond Jubilee Complex (DJC) 2020 0.12
5 STP at Nehru Hall 2022 0.022
6 ETP in Chemical Eng. Annex 2023 0.01
7 ETP for DJC 2020 0.01
  Total Capacity   2.312

The largest sewage treatment plant of 1.35 Million litres per day (MLD) capacity is operational and equipped with an Anoxic tank and Clarifier. Data for the plant are summarized below. The construction of a new 4.0 MLD plant has been undertaken through CPWD.

IIT Kharagpur

Data from 1.35 MLD Sewage Treatment Plant, IIT Kharagpur

Parameter Unit Inlet Outlet Regulatory limit (NGT, 2018)
pH - 6.9 7.5 5.5 to 9.0
COD mg/L 567 5 50
BOD3 at 27 ℃ mg/L 121 3 10
TSS mg/L 156 10 20

COD-Chemical oxygen demand; BOD₃ at 27℃-Biochemical oxygen demand for 3 days at 27℃; TSS-Total suspended solids